Featured Post

Firmware Development Costs

A guide for estimating firmware development costs with analyses of cost drivers for embedded projects.

Orion Serup
#firmware #embedded-systems #pricing #budget
Firmware Development Costs

Step 1: Base Cost Calculation

Formula: Hours × Hourly Rate = Base Cost

Estimate Hours Needed

Project ComplexityHours RequiredTimeline
Basic sensor/controller100-300 hrs1-2 months
IoT device with connectivity300-800 hrs2-4 months
Industrial control system600-1,500 hrs3-6 months
Medical/safety device1,200-3,000 hrs6-10 months

Apply Hourly Rates

RegionTypical RateQualityCommunication
US/Canada$175/hrConsistentExcellent
Western Europe$150/hrHighGood
Eastern Europe$80/hrVariableFair
Mexico$90/hrGoodGood
India$40/hrVariableFair
China$50/hrHit/missChallenging

Step 2: Apply Cost Multipliers

Platform Complexity

PlatformRate MultiplierWhy Different
8-bit MCU1.0×Simple, basic tools
ARM Cortex-M1.2×Better tools, more features
Linux/RTOS1.4×OS complexity
DSP1.6×Specialized knowledge
FPGA+Firmware1.8×HDL + firmware skills

Power Requirements

Battery Life TargetCost AdderDevelopment Time
Plugged in+$0Base timeline
Days-Weeks+$3-6k+1-2 weeks
Months+$6-12k+2-3 weeks
Years+$12-25k+3-6 weeks
10+ years+$25-45k+6-10 weeks

Wireless Protocols (Implementation + Certification)

Note: Costs assume custom implementation. Vendor SDKs reduce these by 60-80%.

ProtocolTotal CostDevelopment Time
BLE+$8-18k+2-4 weeks
WiFi+$12-25k+3-6 weeks
Cellular+$18-35k+4-8 weeks
LoRa+$8-15k+2-4 weeks
Zigbee+$8-16k+3-5 weeks
Thread+$10-18k+3-5 weeks

Safety/Compliance Multiplier

StandardFinal Cost MultiplierExtra Timeline
Commercial1.0×None
Industrial1.5×+1-2 months
Automotive1.8×+2-4 months
Medical2.2×+4-8 months

Step 3: Common Features

Note: Custom implementation costs. Libraries reduce these by 50-80%.

FeatureCostWhen You Need It
Bootloader+$2-5kField updates
OTA updates+$6-15kRemote devices
Unit testing+$3-6kQuality critical
Driver development+$2-12kCustom hardware
Security/encryption+$5-12kData protection
DSP/control algorithms+$6-18kMotor control, signal processing
Integration testing+$3-7kSystem-level validation
Technical documentation+$2-6kCompliance, maintenance docs
Team training/bootcamp+$3-10kNew platforms or technologies
Hardware abstraction layer+$4-12kCustom silicon or unique peripherals
IP licensing+$1-8kProtocol stacks, codec licenses
Certification costs+$8-20kFCC, CE, carrier approvals
Maintenance/support+$6-15k/yearPost-deployment updates, bug fixes

Step 4: Code Reuse Changes Everything

Modern firmware development relies heavily on existing code:

  • Vendor SDKs (Nordic, ST, TI)
  • Open source libraries
  • Proven code frameworks
  • Partner ecosystems

Realistic efficiency factors:

  • Standard platforms: 80-90% code reuse
  • New platforms: 60-70% code reuse
  • Custom hardware: 40-60% code reuse

Realistic Cost Examples

Example 1: BLE Temperature Sensor

Scope: Read sensors, BLE transmission, 1-year battery

  • From-scratch estimate: 400 hours × $175 = $70,000
  • Using Nordic SDK: 70 hours × $175 = $12,250
  • Add power optimization: +$8,000
  • Add testing/integration: +$5,000
  • Realistic total: $25,000
  • Timeline: 6-8 weeks

Example 2: Industrial Data Logger

Scope: Multiple sensors, Modbus, local storage, HMI

  • From-scratch estimate: 800 hours × $175 = $140,000
  • Using ST ecosystem: 160 hours × $175 = $28,000
  • Add Modbus stack: +$8,000
  • Add industrial compliance: +$12,000
  • Realistic total: $48,000
  • Timeline: 10-12 weeks

Example 3: Motor Controller with Safety

Scope: FOC control, CAN, functional safety

  • From-scratch estimate: 1200 hours × $175 = $210,000
  • Using TI MotorWare: 240 hours × $175 = $42,000
  • Add safety features: +$25,000
  • Add compliance docs: +$18,000
  • Realistic total: $85,000
  • Timeline: 16-20 weeks

What You Actually Pay

ComplexityTypical RangeWhat’s Included
Basic control$8k-18kSensors, basic I/O, simple protocols
Connected device$18k-45kWireless, power optimization, protocols
Industrial system$35k-85kMultiple protocols, compliance, HMI
Safety-critical$70k-150kFunctional safety, extensive testing

Bundle Pricing Reality

When you need multiple features, you often get cost breaks:

Feature CombinationIndividual CostBundle CostSavings
BLE + Power optimization$18k + $6k = $24k$20k17%
WiFi + OTA + Security$25k + $15k + $12k = $52k$40k23%
DSP + Integration testing$18k + $7k = $25k$20k20%
WiFi + Certification + Maintenance$25k + $12k + $10k = $47k$38k19%
Multiple wireless + compliance$35k + $25k = $60k$45k25%

Why bundles cost less:

  • Shared infrastructure code
  • Combined testing phases
  • Single integration effort
  • Vendor ecosystem advantages

For complete project budgeting, see our hardware design cost guide covering PCB design, fabrication, and assembly costs.

Disclaimer: All costs and timelines are industry averages based on 2024 data. Actual project costs vary significantly based on specific requirements, team experience, market conditions, and chosen technology stacks. Regional development costs vary 20-60% depending on location and quality requirements.